Videos
Installation
Automatic Wind Load Relieving System
Applications in Construction Sites
Projects
Hong Kong – Yuen Long Effluent Polishing Plant – Main Works for Stage 1 (DC/2019/10)
Type: Authority
Authority: DSD
Year: 2021
Contractor: Paul Y-CREC JV
Size: 4-m high SilentUP® noise barrier
Hong Kong – Tung Chung New Town Extension – Major Infrastructure Works (NL/2020/03)
Type: Authority
Authority: CEDD
Year: 2021
Contractor: Build King Civil Engineering Limited
Size: 7-m high SilentUP® noise barrier
Hong Kong – Tseung kwan O – Lam Tin Tunnel (NE/2015/01)
Type: Authority
Authority: CEDD
Year: 2016
Contractor: Leighton – China State Joint Venture
Size: 5-m high SilentUP® noise barrier
Hong Kong – Hiram’s Highway Improvement
Type: Authority
Authority: HyD
Year: 2017
Contractor: China State Construction Engineering (Hong Kong) Limited
Size: 3-m high SilentUP® noise barrier
Hong Kong – Liantang/Heung yuen Wai Boundary Control Point
Type: Authority
Authority: CEDD
Year: 2016
Contractor: Leighton Contractors (Asia) Limited
Size: 5-m high SilentUP® noise barrier
Hong Kong – Widening of the section of Castle Peak Road – Castle Peak Bay between Hoi Wing Road and Hong Kong Gold Coast Phase I (HY/2020/07)
Type: Authority
Authority: HyD
Year: 2021
Contractor: China State – Alchmex Joint Venture
Size: 5-m high SilentUP® noise barrier
Hong Kong – West Kowloon terminus Station (XR810A)
Type: Public Utility
Company: MTRCL
Year: 2017
Contractor: Leighton-Gammon Joint Venture
Size: 8-m wide x 10-m long SilentUP® shaft cover
Hong Kong – Demolition Work at Mai Po Nature Reserve Infrastructure
Type: Private Sector
Company: WWF
Year: 2019
Contractor: Willey Construction and Engineering Company
Size: 5-m high SilentUP® noise barrier
Hong Kong – Exhibition Station and Western Approach Tunnel (SCL 1123)
Type: Public Utility
Company: MTRCL
Year: 2017
Contractor: China State – Alchmex Joint Venture
Size: 7-m high SilentUP® noise barrier
Hong Kong – Taikoo Place redevelopment project
Type: Private Sector
Company: Swire Properties
Year: 2017
Contractor: G & M Engineering Company Ltd
Size: 5.5-m high SilentUP® noise barrier
Hong Kong – Joint-user Government Office Building in Area 67, Tseung Kwan O
Type: Authority
Authority: ArchSD
Year: 2020
Contractor: Able – Paul Y. Joint Venture
Size: 5-m high SilentUP® noise barrier
Hong Kong – Redevelopment of Kwai Chung Hospital
Type: Authority related organisation
Authority: HA
Year: 2020
Contractor: Shui On Joint Venture
Size: 5-m high SilentUP® noise barrier


