SD/2022/02 Site Formation and Infrastructure Works for the Development of ex-Cha Kwo Ling Kaolin Mine Site
Client: Vibro Joint Venture
Type: Authority related organisation
Year: 2024
HY/2018/08 – CKR Central Tunnel
Client: Bouygues Travaux Publics
Type: Authority related organisation
Year: 2020
Tung Chung New Town Extension (NL/2020/05)
Client: Buildking
Type: Public Authority
Year: 2023
Total of 10 sets of dampers were magnetically attached on two opposing sides of the metallic surface of the breaker head, 5 sets for each side, secured by hard plastic bands surrounding the SilentMAGic. ~2dB(A) of noise reduction was measured.
Major Infrastructure Works in Tung Chung East (NL/2020/03)
Client:Buildking
Type:Public Authority
Year:2021
Details:Vibratory hammer is used for sheet piling at a construction site of Tung Chung New Town Extension. With the implementation of 6 sets Piling SilentMAGic, sheet pile vibration reduction of 9-14dB from 630Hz to 1250Hz were measured at the 1st, 2nd and 3rd piles next to the driven pile. The noise reduction of ~7dB(A) averaged noise level and ~9dB(A) maximum noise level were measured at 7m and 22m from the sheet pile.